Jayadeva Hospital metro station

Coordinates: 12°55′00″N 77°36′00″E / 12.916744°N 77.600117°E / 12.916744; 77.600117
From Wikipedia, the free encyclopedia

Jayadeva Hospital
Namma Metro station
Side view of Under Construction of this metro station under Yellow Line and Pink Line of Namma Metro
General information
LocationJayadeva Junction, BHBCS Layout, BTM Layout Stage 2, Bengaluru, Karnataka 560076
Coordinates12°55′00″N 77°36′00″E / 12.916744°N 77.600117°E / 12.916744; 77.600117
Elevation29 m (95 ft) from Street Level (TBC)
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line Pink Line
Platforms  Side platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Bommasandra
  Side platform
Platform-3 → Kalena Agrahara
Platform-4 → Nagawara
Platform numbers (TBC)
Tracks4
Construction
Structure typeElevated, Double track x2
Platform levels4
Accessible(TBC)
Other information
StatusUnder Construction
History
Opening  November 2024; 4 months' time (November 2024) (TBC)
  March 2025; 8 months' time (March 2025) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Ragigudda Yellow Line
(Operational around December 2024)
BTM Layout
towards Bommasandra
Tavarekere
towards Nagawara
Pink Line
(Operational around 2025)
JP Nagar 4th Phase
Location
Map

Jayadeva Hospital is an upcoming double-elevated interchange metro station on the North-South corridor of the Yellow Line and Pink Line[1] of Namma Metro in Bangalore, India. This metro station will be the first multi-elevated interchange metro station in the Namma Metro network. This metro station is named after the Sri Jayadeva Institute of Cardiovascular Sciences and Research which is located nearby and serves MICO Layout (BTM), Guruppanpalya, Jayanagar and JP Nagar 3rd Phase.

As per latest reports, the Yellow Line can be operational only around December 2024 since atleast 6 trainsets are required for commercial operations as against the current 1 prototype train [2] and the Pink Line only in 2025.[3]

Station layout[edit]

This metro station will consist of five levels from underground to the top level as given below:

  • Level 1 → Underpass connecting Bannerghatta and Dairy Circle
  • Level 2 → Street Level surface connecting Ragigudda and BTM Layout
  • Level 3 → Elevated Flyover from Ragigudda to Central Silk Board
  • Level 4 → Yellow Line Platforms
  • Level 5 → Mezzanine (Concourse)
  • Level 6 → Pink Line Platforms

Station layout (TBC)[edit]

Jayadeva Hospital track layout (TBC)
P#
P#
Station with two tracks and two side platforms
Jayadeva Hospital track layout (TBC)
P#
P#
Station with two tracks and two side platforms
** Proposed
UG Underpass level Bannerghatta - Dairy Circle Underpass
G Street level Exit/Entrance
L1 Flyover Raggigudda-Silk Board Flyover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Eastbound
Towards → Bommasandra next station is BTM Layout
Platform #
Westbound
Towards ← Rashtreeya Vidyalaya Road next station is Ragigudda
Side platform | Doors will open on the left Disabled access
L3 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L4 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Kalena Agrahara next station is JP Nagar 4th Phase Change at the next station for Orange Line **(Proposed)
Platform #
Northbound
Towards ← Nagawara next station is Tavarekere
Side platform | Doors will open on the left Disabled access
L4 Platform Numbers (TBC)

See also[edit]

References[edit]

  1. ^ "Namma Metro Pink Line: Route, Status, Completion Date & More". timesproperty. Retrieved 15 December 2023.
  2. ^ "Titagarh to supply the first train for Bengaluru metro's Electronics City corridor in August 2024". Moneycontrol. 10 May 2024. Retrieved 1 June 2024.
  3. ^ "Bengaluru Metro's Pink Line to be operational by 2025, says DK Shivakumar". Moneycontrol. 8 February 2024. Retrieved 1 June 2024.

External links[edit]